?

Log in

 
 
09 March 2010 @ 02:24 pm
More planning  
Next weekend: More work on the Interesting Times. Duane, do you have the measurements for the floorboards with you? Also, do we want to start working on the exterior, weather permitting?

I'd like to gather up the decorations for the room party and put them in the steamer trunk. If you've got some decorations you'd like to bring and don't want to lug them in your own bags, bring them over and we'll pack them into the trunk. Also packing up the cheap booze. Any donations to the room party on that front, or in the form of snacks or plastic cups are also welcome.

Also- does anyone need assistance with getting costumes together, fitting, repairing or altering things? I know I need to work on a couple pieces of my and James' outfits, and was thinking maybe we could get together Saturday the 20th for a costuming day.

Just a reminder, if you haven't already reserved your room, please call and do that. The web site says the hotel is filling up fast.
 
 
 
lisichancelisichance on March 9th, 2010 08:40 pm (UTC)
Oh, yeah. I'm planning to go to the ReStore Saturday morning and pick up the hardwood flooring & would appreciate the square footage I'll need.
Duaneduane_kc on March 10th, 2010 12:57 am (UTC)
I think we figured 18 square feet. All you'll need to do is measure from the front seats to the back wall, and then across over the wheels; that'll get you a general idea.
Duaneduane_kc on March 10th, 2010 12:53 am (UTC)
We never took measurements for the floorboards, and the measurements for the subfloor supports, I left there.

As for the exterior, I kinda think we need to get it at least drivable before we worry about that. Besides, paint won't dry properly in the cold.