?

Log in

 
 
07 March 2010 @ 07:14 pm
weekend update  
so, as we were unable to get the metal this week, (hans and I shall do so on friday) we prepped the bus for welding next week.   the floor boards are ready to be put in, we still need to pick up the flooring, which hans and I can measure for lisi on friday.  aside from that, we have an estimate from the young man  doing the welding.  if everything is prepped for him, and ready to rock and roll on sunday, it should take him about 2 hours or so to put the frame in.  and yea, he can do the job.  the patchs on where the existing frame broke are in place, and holding well.
 
 
 
Duaneduane_kc on March 8th, 2010 02:49 am (UTC)
Sorry I didn't make it over; last week changing schedules took more out of me than I thought. Woke up Saturday at two, woke up today at 5PM. I do have the futon, though.